Project: I-CAVS   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:paolo cavosi   -  
Project:   Vans - RV-10
Total Hours:2429.2
Total Flight Time:
Start/Last Date:May 28, 2019 - No Finish Date
Engine:IO-540 Thunderbolt Serial # EL-38135-48E
Propeller:MT Propeller MTV-12-B/193-53 serial 22G1268-K
Panel:Garmin G3X
 
Friendly URL: https://eaabuilderslog.org?s=I-CAVS

Home or Last Project Picture

Apr 14, 2023     Firewall Insulation - (3 hours) Category: Firewall
Trimmed the fiberfrax to size leaving 1/8" between the firewall flanges and the fiberfrax. Trimmed the recess fiberfrax flanges.
Tested the installation of the EYEBALL FIREWALL FITTING- SS PRESSURE PLATE - STEEL TTP. Cutting the steel foil with a cutter once squeezed between the eyeball flanges is pretty easy. Drilling holes for the screws with #30 is not enough, better use a #21 through the eyeball flange
End result is very nice, need to replicate on the final fitting.
Ordered the fire barrier 2000 sealant.
 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.